Here is a typical scenario (the figures are illustrative). A customer orders 5,000 folding cartons. The sales manager prices the job in Excel: four cartons fit on a sheet, so 1,250 sheets, plus 3% for spoilage. The job is printed, laminated and die-cut. The warehouse then counts about 4,200 good cartons, not 5,000. Nobody allowed paper for make-ready. Rerunning the missing 800 means setting up printing, lamination and die-cutting all over again, and the job is now a loss.
If you have acquired a print shop in Uzbekistan or are setting one up, this pattern will look familiar. This article covers what a printing house ERP (one system that runs orders, production, stock and money in a single database) needs to do: price jobs by run length, handle proof approval, schedule presses and track paper. A 10-question rollout checklist closes it out.
When a custom system makes sense at all and how it is built is covered in the main guide to custom ERP development. This article focuses only on what is specific to printing.
Why pricing a print job is harder than ordinary manufacturing
In a typical factory, one product repeats hundreds of times. In a print shop, almost every job is a new product. Format, stock, number of colours, run length and finishing change every time.
A few terms first:
- Run length — the number of copies in one job.
- Prepress — everything before printing: file checks, colour management and platemaking.
- Plate — a thin metal printing plate carrying the image, usually one per ink colour.
- Make-ready — setting up a machine for a job. Until colour and registration are right, a number of sheets go to waste.
- Imposition — the layout of items on the large press sheet. It decides how many cartons or labels fit on one sheet.
- Grammage — the weight of one square metre of paper, in g/m². Office paper is light; carton board is far heavier.
The core difficulty is fixed costs. Plates, make-ready and the cutting die (the steel-rule form that cuts out the carton blank) cost roughly the same whether the run is 500 or 50,000. So a short run makes each copy expensive, and a long run makes it cheap. A spreadsheet often hides this behind a single percentage markup, and that is where the error starts.
Job estimating: what the system has to calculate
A good estimator builds the whole process chain from a few inputs. The sales manager picks product type, size, stock, colours, run length and finishing. The system calculates:
Also read Software for a Building Materials Store in Uzbekistan: Units of Measure, Credit, Contractor Bonuses and Delivery- Imposition. How many items fit on the chosen press sheet format.
- Net sheets. Run length divided by items per sheet.
- Process allowance. Make-ready sheets for each operation and a running spoilage percentage are added separately.
- Plates. Usually one per colour; a spot colour (a pre-mixed ink such as a Pantone shade) adds another.
- Ink, varnish and laminating film — based on the printed area.
- Press time — based on make-ready and running speed.
- Finishing. Cutting, lamination, die-cutting, gluing or binding.
Let's rerun the cartons from the opening. Net sheets: 5,000 / 4 = 1,250. Press make-ready 120 sheets, laminator set-up 30, die-cutter make-ready 60. Running spoilage about 3%, or roughly 40 of the 1,250 sheets. The job needed roughly 1,500 sheets; the manager allowed 1,290.
Now look at how run length drives price. Illustrative example: fixed costs (four plates, make-ready time, a new die) are UZS 2,380,000. One sheet with paper, ink and lamination costs UZS 6,500. Make-ready allowance is 210 sheets per run, plus 3% of net sheets for spoilage.
- 1,000 — Sheets: 468; Cost, UZS: 5,422,000; Per piece, UZS: 5,422
- 5,000 — Sheets: 1,498; Cost, UZS: 12,117,000; Per piece, UZS: 2,423
- 20,000 — Sheets: 5,360; Cost, UZS: 37,220,000; Per piece, UZS: 1,861
A twentyfold increase in run length brings unit cost down almost threefold. Price every run with one markup, and short runs lose money while long runs come out more expensive than competitors.
The same estimator helps choose the process. Digital printing has no plates and make-ready takes only a few sheets, but each sheet costs more. The system prices both side by side and shows the run length at which offset becomes cheaper.
The finished estimate goes to the customer as a quote. Several run-length options in one quote usually work well: the customer sees for themselves how the unit price drops on a larger run. How to structure such a quote is covered in the article on commercial proposals and price presentation.

Prepress and proof approval
Many reprints and customer disputes start in the artwork, not on the press. The wrong version gets printed, a phone number has a typo, a colour looked different on screen. Then the customer says, "I never approved that."
For prepress, the system keeps:
- Artwork versions. Every new file is saved as a new version; old ones are never deleted.
- Preflight. A checklist for image resolution, colour mode (CMYK for print) and bleed (the extra margin trimmed off after cutting). The checker's name is recorded.
- Customer approval. The customer receives a link to a specific version and clicks "approve"; time and name are stored.
- A hard block. Without approval, the system does not release the job to platemaking or to press.
When colour matters, a contract proof is produced: a reference print close to the final result. The customer signs it, and the press operator matches against it.
When spoilage happens, a cause is selected: artwork error, prepress error, printing, finishing or paper quality. After three or four months, you can see which cause costs the most. How to collect and analyse causes is described in the article on quality control in ERP.
Production stages and press capacity
An approved job becomes a routing: the sequence of operations it will pass through. For a folding carton, a typical routing is:
- Printing — on an offset or digital press.
- Lamination — applying a protective film.
- Cutting — where needed, a guillotine trims the sheet to the die-cutter format.
- Die-cutting — cutting the carton blank and creasing the fold lines.
- Gluing and packing.
Books and magazines replace die-cutting with folding and binding; roll labels are die-cut on the roll and rewound. Large-format work such as banners and vinyl is tracked in square metres rather than sheets. Each product type's routing is set up once as a template.
Every station records completed work by scanning the barcode on the job ticket. Management sees which stage each job is at and where it is stuck.
Capacity is calculated from the same data. The system holds each press's hourly output, shifts and planned maintenance days. When a new job arrives, it finds a free slot and proposes a realistic due date. Running jobs on the same sheet format or the same inks back to back shortens make-ready. Planning logic by shift and station is covered in detail in the article on production planning.

Paper stock: format, grammage and reservations
Paper is usually a print shop's largest cost line. Recording it as "paper, 200 kg" is not enough. Every item needs at least four attributes: type (coated, uncoated offset, board), grammage, sheet format and manufacturer. Receiving by the kilogram and issuing by the sheet is practical. The system converts between the two using grammage and format.
When a job is approved, the paper it needs is reserved for it. That stops a sales manager from promising another customer that the stock is available. If the reservation falls short, the system raises a purchase request. Paper is often imported and lead times can be long, so set minimum stock levels with that lead time in mind.
Large offcuts remain after guillotining. They are received separately as reusable stock, with size and grammage. On short runs, the system offers them first.
Plan versus actual: job cost and customer settlements
Once the run is finished, the most important comparison begins. How many sheets were in the estimate, and how many actually left the warehouse? How many went to make-ready? How many hours was the press occupied?
In our illustrative example, the manager allowed 1,290 sheets and the actual figure was 1,500. That is 210 sheets, or about UZS 1,365,000 at sheet cost. And that is not all: the missing 800 cartons need another 200 net sheets, a second 210-sheet make-ready and spoilage, about 410–420 sheets or roughly UZS 2.7 million more, before press time. When this comparison is visible for every job, make-ready allowances get corrected against reality. Estimates become more accurate each month. Methods for allocating shop overheads to jobs are covered in the article on cost accounting in ERP.
Customer settlements are tied to the job as well. Typically there is a prepayment, with the balance on shipment or on credit terms. The system shows how much has been paid on each job and when the debt falls due. A new job from a customer in arrears can be held back from press until payment arrives. Agree with a local accountant on when documents are issued for prepayment and final payment, and configure that rule once.
Pre-rollout checklist
- Is there an estimating template for your main product types?
- Are make-ready and spoilage allowances recorded per press and per operation?
- Can the estimator compare offset and digital printing?
- Are artwork versions and customer approvals stored in the system?
- Can a job reach the press without approval?
- Is a routing defined for every product type?
- Are press capacities and shifts entered?
- Is paper tracked by type, grammage and format?
- Is paper reserved against jobs?
- Are planned and actual sheet counts compared on every job?
Start with one product group, such as cartons. Run it against this checklist for two or three months, then extend it to labels and books and magazines.
Conclusion
In a print shop, profit is more often lost in the estimate than on the press: make-ready allowance, fixed costs and run-length pricing are left out. An ERP ties each job into one chain, from estimate through proof approval and press schedule to paper stock. When plan and actual are compared after every run, allowances sharpen and prices become trustworthy. Start today: compare planned and actual sheet counts on your last ten jobs.
Frequently asked questions
Does a small print shop or digital print centre need an ERP?
With a few simple jobs a day and one press, a well-built price sheet may be enough. A system becomes necessary once jobs run in parallel, offset and digital work side by side, and separate lamination and cutting stations appear. That is when paper, deadlines and press capacity stop being trackable by hand.
How much paper should be allowed for make-ready?
There is no universal figure. It depends on the press, the number of colours, the stock and the finishing steps that follow. The most reliable approach is to record how many sheets were actually used on recent jobs and derive the allowance from that. The system then stores a separate allowance for each press and operation.
How should paper supplied by the customer be handled?
It is received into a separate stock location as the customer's property and issued only to that customer's job. The quote has no paper line, but make-ready and spoilage are still calculated, which tells you how much paper to ask the customer to deliver. Confirm the documentation with a local accountant.
What if the delivered quantity is slightly over or under the order?
Agree on this in the contract upfront: what deviation is acceptable and whether billing follows the actual quantity. The system stores that rule and issues the final invoice for the quantity actually delivered to the warehouse.
Is there off-the-shelf print software, or does it have to be custom?
Off-the-shelf systems exist; the industry calls them print MIS (management information systems). They handle estimating and press scheduling well, but check early how they cope with UZS pricing, local documents and your accounting software. Use the checklist in this article when choosing: which items work out of the box and which need configuration or custom development.
Setting up or running a print operation in Uzbekistan?
Let's review how estimating, proof approval, press scheduling and paper stock work at your plant today and identify which part is worth automating first.